Document Title P D V Wind Energy Draft E I R
Type Draft EIRs (All Types)
SCH# 2006061105
County Name Kern ( South CA Region )
Lead Agency Kern County Planning Department
Abstract
A change in zone classification to incorporate the Wind Energy (WE) combining district on approximately 3,854 acres of a 6,435-acre project site and approval of a conditional use permit (CUP) to allow temporary concrete batch plans to facilitate construction. Intent is to develop a 300 Megawatt (MW) wind energy plant consisting of a maximum of 300 wind turbines not to exceed 400 feet in height ranging in capacity from 1 MW to 2.8 MW each. Implementation of the request would also entail construction of a project substation, an interconnection yard/switching station, on and off-site access roads, control cables, subsurface feeder line corridors and transmission lines necessary to serve the project. The temporary batch plants would only be onsite during construction and would be used to provide concrete material for turbine, substation, operation and maintenance building foundations.


File Type Size Options
Source Document 53.11 MB
Explore CEQAmap
CEQAmap Home
Search CEQA Database
Contact Us
Login
Create FREE Account
 

© 2003 - 2017, Don Ritter Consulting All Rights Reserved.