Document Title Subsurface Intake System Test Well Mnd
Type Mitigated Negative Declarations
SCH# 2005101069
County Name Los Angeles ( South / Coastal CA Region )
Lead Agency Las Virgenes Municipal Water District
Abstract
The proposed modifications are divided into two phases. Phase 1A includes new pipeline (10 and 12 inch diameter) within the Mulholland Highway right-of-way between Old Topanga Canyon Road and Dry Canyon-Cold Creek Road (5,800 feet). Phase 1B includes new pipeline (10-inch diameter) within the Mulholland Highway right-of-way from the Cold Canyon Pump Station near the Cold Canyon/Mulholland Highway intersection east to the Stunt Road/Mulholland Highway intersection (4040 feet). Phase 2 involves the installation of three segments of 10-inch diamter pipeline. The northern portion would extend from the Mountain Park Drive / Mulholland Highway intersection northeast to the Valley View Road / Mulholland Highway intersection (2,200 feet).


File Type Size Options
Source Document 2.37 MB
Explore CEQAmap
CEQAmap Home
Search CEQA Database
Contact Us
Login
Create FREE Account
 

© 2003 - 2018, Don Ritter Consulting All Rights Reserved.