Document Title Blythe-headgate Transmission Line Ea
Type Other Project Documents
SCH# 2005094001
County Name
Lead Agency U.S. Department of Energy
Abstract
The U.S. Department of Energy (DOE) Western Area Power Administration (Western) proposes to replace approximately 52 miles of existing wood H-frame and specialized wood pole structures associated with the Parker-Blythe No. 1 161-kV Transmission Line from Headgate Rock Dam near Parker, Arizona to the Blythe Substation in Blythe, California. For this replacement portion of the Parker-Blythe No. 1 161-kV Transmission Line, referred to here as the Blythe-Headgate Rock 161-kV Transmission Line, a segment will be rerouted around the culturally sensitive area known as Black Point Mesa. This reroute would affect less than one mile of the project alignment.


File Type Size Options
Source Document 79.73 MB
Explore CEQAmap
CEQAmap Home
Search CEQA Database
Contact Us
Login
Create FREE Account
 

© 2003 - 2018, Don Ritter Consulting All Rights Reserved.