Document Title D E I R California American Water Company's Coastal Water Project
Type Draft EIRs (All Types)
SCH# 2006101004
County Name Monterey ( South / / Coastal CA Region )
Lead Agency Public Utilities Commission
Abstract
The proposed project is called the CWP and is being proposed by CalAM. The water supply is needed to replace exisitng supplies that are constrained by recent legal decisions affecting the Carmel River and Seaside Groundwater Basin water resources. The CWP would produce desalinated water, convey it to the existing CalAM distribution system, and increase the system's use of storage capacity in the Seaside Groundwater Basin. The CWP would consist of several distinct components: a seawater intake system; a desalination plant; a brine discharge system; product water conveyance pipelines and storage facilities; and an aquifer storage and recovery system.


File Type Size Options
Project Description 108.90 MB
Explore CEQAmap
CEQAmap Home
Search CEQA Database
Contact Us
Login
Create FREE Account
 

© 2003 - 2018, Don Ritter Consulting All Rights Reserved.