Document Title Walton Waterline And Storage Tank Project M N D
Type Mitigated Negative Declarations
SCH# 2008012043
County Name Sutter ( North CA Region )
Lead Agency Yuba, City of
Abstract
The Proposed Project would consist of the installation of approximately 15,500 feet of 30-inch diameter water transmission main, an above grade storage tank with up to 4-million gallons of capacity, a 7,000 gpm booster pumping station, and a groundwater well with treatment facility option. The proposed water main would tie in with an existing 30-inch water main located in the vicinity of B Street and Clark Avenue. This water main feeds into the existing Yuba City Water Treatment Plant located at 701 Northgate Drive in the northeast portion of which draws surface from the Feather River. The Proposed Project will serve an area that is largely builtout and will not see substantial growth in the future.


File Type Size Options
Source Document 2.97 MB
Explore CEQAmap
CEQAmap Home
Search CEQA Database
Contact Us
Login
Create FREE Account
 

© 2003 - 2018, Don Ritter Consulting All Rights Reserved.