Document Title C S U L B Campus Master Plan Draft E I R
Type Draft EIRs (All Types)
SCH# 2007061092
County Name
Lead Agency
Abstract
Approximately 16 miles of 60-kV transmission line from Trinity Dam to Lewiston Dam, spur to Lewiston Substation, and on to a new 50 x 110' Weaverville Switchyard south of Weaverville and east of Highway 299. Removal of 5.3 miles of 12-kV distribution line in Shasta-Trinity NF and reuse of right-of-way. Three-way tap structure west of Lewiston Dam. Approximately 2 miles of construction-access roads would be built, and some existing roads improved where needed.


File Type Size Options
Source Document 12.01 MB
Explore CEQAmap
CEQAmap Home
Search CEQA Database
Contact Us
Login
Create FREE Account
 

© 2003 - 2018, Don Ritter Consulting All Rights Reserved.