Document Title Long Beach Generating Station Neg Dec
Type Draft EIRs (All Types)
SCH# 2007021061
County Name Los Angeles ( South / Coastal CA Region )
Lead Agency Long Beach, Port of
Abstract
The proposed project consists of the re-powering of existing Combustion Turbine Generator (CTG) Units 1 through 4 to create a nominal 65 MWs of new power generating capacity from each unit, for a combined total of 260 MWs from the entire facility. CTG Units 5, 6, 7 and steam turbine generator Units 8 and 9 will not be re-powered as part of this project. The CTG Units 1-4 continue to be exclusively natural-gas-fired and will be fitted with Best Available Control Technology (BACT) to meet the existing air emission control requirements of the South Coast Air Quality Management District (SCAQMD). The project will continue to use the existing utility interconnections at the site.


File Type Size Options
Source Document 53.23 MB
Explore CEQAmap
CEQAmap Home
Search CEQA Database
Contact Us
Login
Create FREE Account
 

© 2003 - 2018, Don Ritter Consulting All Rights Reserved.