Document Title Dillard-orange Electric Sub-station Mnd
Type Mitigated Negative Declarations
SCH# 2007052123
County Name Sacramento ( North CA Region )
Lead Agency Sacramento Municipal Utility District
Abstract
Construct and operate an expanded/upgraded electrical substation and associated subtransmission lines. Proposed improvements to be constructed at the existing substation beginning in September 2007 and taking approximately four months to complete include: - Expanding the substation footprint to the actual property boundaries from approx. 8,150 sq. ft. - Paving the entrance of the substation. - Adding a new transformer with 6.25 MVA of capacity and an associated concrete pad at the existing substation, which currently has a 6.25 MVA transformer. The total capacity with the proposed improvements would be 12. MVA. - Additional lighting would not be required with the expansion. All substation equipment would be either a dull green or light gray finish. The new transformer would contain approx. 5,300 gallons of insulating oil. Project specifications would require that all transformer oils be essentially free from polychlorinated biphenyl compounds (PCBs) (<2ppm). The substation control system would have a battery backup. The sealed battery units would contain diluted sulfuric acid.


File Type Size Options
Source Document 15.63 MB
Explore CEQAmap
CEQAmap Home
Search CEQA Database
Contact Us
Login
Create FREE Account
 

© 2003 - 2018, Don Ritter Consulting All Rights Reserved.