Document Title Exxon Mobile Pipeline Is Mnd
Type Mitigated Negative Declarations
SCH# 2006041054
County Name Los Angeles ( South / Coastal CA Region )
Lead Agency Fish & Game #5
Abstract
The proposed project will replace ExxonMobil's existing M-70 crude oil pipeline in the Santa Clara River bed in Santa Clarita, with a new pipeline of the same diameter by boring approximately 55 feet beneath the lowest part of the riverbed at this location for a length of approximately 1,300 feet. The objective of the proposed project is to rebury the pipeline to a level well below the scour depth of the Santa Clara River since recent substantial scouring has resulted in the current level of cover over the pipeline being somewhat less than five feet of sediment. The installation and testing of the new pipeline will require approximately four weeks.


File Type Size Options
Source Document 9.13 MB
Explore CEQAmap
CEQAmap Home
Search CEQA Database
Contact Us
Login
Create FREE Account
 

© 2003 - 2018, Don Ritter Consulting All Rights Reserved.