Document Title Exington Raw Water Pipeline Mnd
Type Mitigated Negative Declarations
SCH# 2006022031
County Name Santa Clara ( North / Coastal CA Region )
Lead Agency Santa Clara Valley Water District
Abstract
SJWC’s proposed project includes the installation of approximately 10,360 feet of pipeline,
extending from SJWC’s MWTP to connection points at existing pipelines on the eastern
shoreline of the reservoir at two locations. The first connection is approximately 200 feet north
of Soda Springs Creek and the other approximately 3,100 feet south of Soda Springs Creek. The
primary pipeline will extend from the treatment plant to the southernmost connection point
where it will connect to the existing 30-inch pipeline immediately adjacent to Alma Bridge
Road. A lateral connection to an existing 24-inch pipeline requires 540 feet of new 24-inch pipe
that will extend from the primary pipeline to an existing 24-inch pipeline that supplies raw water
from the Lower Cavanee Intake on Soda Springs Creek. Figure 2 depicts the proposed pipeline
alignment, including the lateral connection.


File Type Size Options
Source Document 2.48 MB
Explore CEQAmap
CEQAmap Home
Search CEQA Database
Contact Us
Login
Create FREE Account
 

© 2003 - 2018, Don Ritter Consulting All Rights Reserved.